Requirement mapping: Translating project briefs into technical blueprints with 3D modeling
Cross-functional collaboration: Coordinating R&D, production, and QA teams for concurrent engineering
Milestone verification: Conducting FAT (Factory Acceptance Test) with clients to ensure alignment with project timelines
Class 1000 cleanroom assembly for sensor modules to prevent contamination
Multi-point calibration using NIST-traceable standards (accuracy ±0.5%)
48-hour continuous operation testing under extreme conditions (-40°C to 70°C)Post-debugging, each device is paired with a digital twin for real-time performance monitoring, ensuring compliance with technical specifications like IEC 62271 or GB/T 18850.
Triple-layer protection: Anti-static bag + shock-absorbing foam + corrugated outer carton
Climate-controlled shipping: Options for temperature-sensitive equipment (2-8°C monitoring)
End-to-end tracking: Automated notifications via IoT logistics tags, with customs clearance support for international ordersEach package includes a damage-inspection QR code linked to our 24/7 support hotline, minimizing transit risks and ensuring 100% delivery integrity.
Contact Person: Ms. Jin
Tel: 15000093078